أنظمة توزيع الطاقة
With our Power Distribution & Backup Systems, Ghali Tech designs, builds and maintains medium-/low-voltage switchgear, busducts, UPS chains and generator-ATS packages to IEC and NFPA standards—ensuring 24/7 power quality and resilience for factories, hospitals and data centres across Syria and the wider Middle East.

LV/MV Switchgear & Bus ducts
Factory-assembled switchboards and sandwich bus ducts distribute power safely compliant with international standards.
UPS & Battery Backup
Double-conversion, modular UPS systems and lithium/VRLA banks provide zero-break transfer for critical IT, medical and process loads.
Generator ATS Integration
Diesel or gas gensets synchronised through control panels and fast automatic transfer switches keep the whole site powered during prolonged outages.
لماذا تختار غالي تك؟
نفخر بتقديم منتجات وخدمات عالية الجودة، إلى جانب دعم فني لا مثيل له. بفضل سنوات خبرتنا الطويلة في هذا المجال، اكتسبنا سمعة طيبة بالتميز، وأصبحنا الخيار الأمثل للعملاء الباحثين عن الأفضل.
خبرة معتمدة
يتمتع فريقنا من المحترفين المهرة بخبرة لا مثيل لها في مجالاتهم المعنية، مما يضمن حصولك على أعلى مستوى من الخدمة.
التسليم من البداية إلى النهاية
نحن ندرك أن احتياجات كل عميل فريدة من نوعها، ونقوم بتصميم حلولنا لتلبية احتياجاتك المحددة، وتقديم خيارات مخصصة تتوافق تمامًا مع أهدافك.
سجل حافل بالنجاحات
نحن نقدر وقتك ونضمن لك التسليم لمنتجاتنا / خدماتنا، مما يتيح لكم البقاء على المسار الصحيح والوفاء بالمواعيد النهائية الخاصة بكم.
الأسئلة الشائعة
1. What causes the frequent brownouts seen in Syrian and GCC grids, and how can modern switchgear fix them?
Aging utility feeders, peak-summer overloads and wide voltage swings drop line voltage below 200 V. switchgear with built-in automatic voltage regulators and harmonic filters stabilises output, protecting motors and PLCs
How does desert heat and dust affect UPS batteries in Middle-East facilities?
Ambient temperatures above 45 °C and airborne sand cut battery life nearly in half; we specify high-temperature lithium packs, battery cabinets and continuous thermal monitoring to maintain the full five-year design life.
How often should UPS batteries and generators be tested?
Batteries: discharge test every year, replacements at 5–7 years. Generators: weekly no-load start, monthly loaded run, and full load-bank test annually.
المقالات
Hello world!
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!…
Thinking about having Uninterrupted Power?
Request your site Power Distribution assessment
أو اتصل بنا على
